Dependable metal roof installation for Cornwall homeowners from Roofing Brothers — measured on site, done on schedule, and cleaned up after.
A metal roof is what Roofing Brothers is known for, and it has been since 2002. On a Cornwall home that means standing seam or exposed fastener panels set over sound decking and real underlayment, with the ridge, valley and eave trim cut and fit on site rather than forced out of a box.
Roofing Brothers has been doing metal roof installation since 2002, first around Morganton, North Carolina and now for Cornwall homeowners through our network of local crews. The standard has not moved: measure it right, fasten it right, and never cut a corner where water can find it.
Before any metal roof installation starts in Cornwall you will know the price, the material and the schedule. Estimates are always free, and nobody is going to push you to decide while somebody is still standing in your driveway.
How a job actually runs, from the first phone call to the last magnet pass over the driveway.
Nothing gets ordered until you have a written price in hand and have settled on the color you actually want.
Where the decking is sound and there is only one layer, we can often go over the top on purlins. We tell you which one your house calls for.
Synthetic underlayment over the whole roof, ice and water shield in the valleys and at the eaves, then panels set square on the correct fastener spacing.
Then the yard gets picked up, the scrap gets hauled off, and a magnet goes over the drive before we pull out.
Questions homeowners ask us about this kind of work.
Much less than people expect. Over solid decking with underlayment, a Cornwall metal roof sounds about like a shingle roof from inside. The loud tin roof people remember was screwed to open purlins on a barn.
Installed properly over sound decking, a metal roof should give a Cornwall home 40 to 60 years. Standing seam often goes longer because there are no exposed fasteners to work loose or leak.
Around twenty standard colors. Green, burgundy, bronze, black, gray, tan and barn red are the ones most Cornwall homeowners land on. We bring the chart with the estimate so you can hold it against your siding.
A straightforward Cornwall house is usually three to five days. A cut up roof with dormers, valleys and multiple pitches takes longer, because every panel and trim piece gets measured and fit on site.
What people said once the job was finished and the trucks were gone.
"Good crew and a good roof. It took about a week longer than planned because of rain, but they called every single time the schedule moved, which I appreciated."
"Thank you so much to the entire crew at Roofing Brothers for our amazing new tin roof! You were amazing to work with and I couldn't recommend you to others enough! Great communication, pricing, color options, efficiency, and HONESTY! If anyone needs a new roof, I highly recommend this crew! Phenomenal job."
"Tore off two layers of old shingles and found rotten decking underneath. They showed me the boards, told me what the change would cost, and let me decide before going ahead."